Slitting Edge Mill Tp321 Tp201 304 Stainless Steel Coil with Factory Price

Customization: Available
Standard: ASTM, JIS, GB, AISI, DIN, BS
Certification: ISO, RoHS, IBR

Product Description

Basic Information

Model NO.304, 304L, 316, 316L, 430, 201, 321, 310S, 409, 41
Surface TreatmentPolished
TechniqueHot Rolled/Cold Rolled
StockAvailable
Pipe EndPlain End, Beveled End, etc.
FeaturesExcellent Corrosion Resistance; High Strength
CertificateISO9001, CE, SGS, BV, TUV, Iqi, etc.
ApplicationArchitectural Decoration, Industrial Equipment, Chemical Containers
ProcessingCutting, Bending, Welding, Polishing, Beveling
Capacity200,000 Tons/Year

Product Description

Stainless Steel Coil
Stainless Steel Detail 1 Stainless Steel Detail 2

Technical Specifications

Product NameStainless Steel Coil
Materials & GradesASTM A240 304, 304L, 316, 316L, 430; JIS SUS304, SUS430; DIN 1.4301, 1.4401
Thickness0.3mm - 100mm+ (Cold rolled: 0.3mm - 3.0mm)
Width1000mm, 1219mm, 1500mm or customized
Surface Finish2B, BA, Polished, Hairline, Mirror, Sandblasted
StandardsASTM A240, GB/T 3280, JIS G4305, DIN EN 10088-2
Payment TermsT/T, L/C at sight
Delivery TimeStock: 7-10 days; Customized: 15-21 days

Production & Visuals

Production Facility
Video Preview
Warehouse Material Testing

Certifications

Certification 1 Certification 2

Packing & Delivery

Packing Standard Delivery Process

Frequently Asked Questions

Are you a factory or a trading company?
We operate both as a factory and a trading entity, ensuring competitive pricing alongside flexible service and diverse supply options.
What are your main advantages?
We offer custom dimensions, ISO-certified quality control, stable supply from top-tier mills, and rapid processing services.
Can you customize products to specific requirements?
Yes. We can customize dimensions (length, width, thickness), perform coil slitting, and meet various international standards and packaging needs.
What is the typical production lead time?
Standard stock items are ready within 7-10 days. Custom or large-scale orders typically require 15-25 days depending on the specifications.
What are your standard payment terms?
We generally accept T/T (30% deposit, 70% balance before shipment) or an irrevocable L/C at sight.
How do you handle shipping and delivery?
We ship via major ports such as Shanghai or Tianjin using reputable shipping lines, handling all export procedures under FOB, CIF, or CFR terms.

Related Products